Konnex has invested in colocation facilities within the Blue Square Data Centre in Maidenhead. Opened in August 2006, these state-of-the-art data centres offer the latest in advanced security measures, environmental control systems and fault-tolerant power and networking.
• State-of-the-art power management system
• 5mW on-site primary sub-station with second backup 2.5mW sub-station
• N+1 PowerWave redundant UPS system
• 15 minute battery time to allow for generator start-up
• Fully redundant power distribution system
• 6500BHP backup diesel generator
• Network monitored and managed power system from the switch gear to end distribution.
• FM200 dry fire-suppression system in all data centre areas
• Network monitored fire protection
• Fully integrated fire system including fire brigade notification and controlled shutdown.
• N+1 Airedale Air Handling system
• ~20c +/- 2c data floor temperature
• Environmental systems backed up by emergency generator power
• Raised floor designed with at least 18" airflow space to provide optimum cooling.
• 24 hour, 7 days a week Network Operations Centre
• Full time proactive systems maintenance
• Motion and heat sensors
• Secured and monitored access
• Video camera surveillance with access control system
• PAC-TAG secured access
• 24 hour, 7 days a week automatic police notification
• Active monitoring of personnel access control
• Bio-metric identification system
Konnex Managed Hosting was formally located within the Globix Oliver's Yard/City Road data centre. The opening of the Blue Square data centre in Maidenhead coincided with a takeover by TelecityRedbus of the Globix UK operations.